Advertisment

Bhubaneswar Metro Rail Project: Geotechnical Survey

The geotechnical investigation for the proposed Bhubaneswar Metro Rail Project on the stretch between Nandankanan in Bhubaneswar and Trishulia in Cuttack is underway. The Delhi Metro Rail Corporation is carrying out the survey. The soil bearing capacity test has reached the final stages at two to three places and is also underway at several other points on the 26-kilometre-long roadway.

Advertisment

The geotechnical investigation for the proposed Bhubaneswar Metro Rail Project on the stretch between Nandankanan in Bhubaneswar and Trishulia in Cuttack is underway. The Delhi Metro Rail Corporation is carrying out the survey. The soil bearing capacity test has reached the final stages at two to three places and is also underway at several other points on the 26-kilometre-long roadway.

Advertisment
Advertisment
Related Articles
Here are a few more articles:
Read the Next Article