Vertical drilling machine at the Silkyara tunnel as the operation to rescue 41 workers trapped here continues. SJVN and ONGC teams have reached the hill above the tunnel and Vertical drilling work will start as soon as the machine arrives. BRO personnel to quickly transport machines for vertical drilling to hill top. 41 labourers have been trapped inside the collapsed tunnel since the last 14 days.