Odisha conducts ground survey of proposed 2200MW hydel project in Kotia

As per reports, the Andhra Pradesh government has signed an MoU with the Adani Group for a 1200 MW hydroelectric power project in Manyam district near Kotia in August 2023.

Ground Survey At Kotia

Kicking off the proposed 2200MW Pumped Storage Hydropower (PSH) project at Kotia in Koraput, the officials of the Odisha Hydro Power Corporation (OHPC), Adani Group and Tata Consultancy conducted a ground survey for the same at Kotia on Monday.

The bitter dispute regarding territorial jurisdiction over Kotia panchayat in Koraput district between the Odisha and Andhra Pradesh governments crops up every now and then. As Odisha plans to set up hydel project in the area, it has created a face-off-like situation with Andhra Pradesh again with the latter already planning a similar project in the area.