Bathymetric Survey At Odisha’s Hirakud Dam Underway

Chief Engineer of Hirakud Dam, Ananda Chandra Sahu, said the survey work has started following the direction of the Mahanadi Water Disputes Tribunal.

Bathymetric Survey At Odisha’s Hirakud Dam Underway

To measure the depth of the water in the reservoir and the volume of sedimentation at the Hirakud Dam, a bathymetric survey is currently underway at the dam in Sambalpur district. 

The bathymetric survey, also known as hydrographic survey, is the study of beds and depth of a water body like, ocean, lake, river, stream etc. Since the deposit of sediment reduces the water holding capacity of a water body, measurement of sedimentation and steps for its removal are required.